Showing posts with label cabinets. Show all posts
Showing posts with label cabinets. Show all posts

Monday, October 12, 2015

More Progress

More progress was made on the kitchen today. The crown molding was installed.  One cabinet was adjusted for Eric's percussion machine and nebulizer.  After more than a decade of use it will finally have a home of its own, not in the middle of the floor.  More electrical work was done too.  We now have power to where we are moving the tv. Hopefully the electrical will be finished tomorrow. Along with more finishing work. 

On the crafting front I did the finishing work on 2 rag rugs and made almost 2 dozen pair of earrings for the fundraiser on October 21st. I have another 18 layed out and ready for assembly.  I am not working on the earrings right now because I am sitting with a sick Eric.  So I guess that I will do some more knitting.  After all you can never do too much knitting. 

With Eric being sick and the granite being installed tomorrow it should be very interesting around here. My wish for all of you is to have a less interesting day. 

Thursday, October 8, 2015

Fixing Cabinets and Tile

We started off the morning with a 7 am meeting with the contractor. The cabinet makers are currently rushing to fix the boo boo's before 11 am. The tile is suppose to start being layed at 11 am.  I can't wait, they are using a method called floating the tile.  Also some of the tile came in too small to use so it will have to be reordered.  I wonder how fast the tile can get here from the Midwest?

A few of the cabinets had to go back to the shop to fix the boo boo's. The tile guys came on time.

It was really neat to watch the tile being set. One on the tile guys is doing a demo for us. Floating a tile is basically putting  adhesive on the back of the tile, like icing a cake without smoothing out the frosting.  Then they place the tile on the floor. If he tile does not lay, flat they pick it up and add some more adhesive on the floor and then lay the tile.   They lay the tile very fast.  



Wednesday, October 7, 2015

Home Remodel, More Cabinets

Today the dishwasher was delivered. I would like to say that the Lowe's Home Improvement delivery man went the extra mile.  He moved the dishwasher so that I could get Eric's wheelchair out of the car and into the house. That is excellent customer service in my humble opinion. I am sorry that I forgot his name. 

More cabinets were installed today. So we have all the cabinets, but not all the doors.  One wall of cabinets came in 6 inches too short. A couple of holes were cut in the wrong place. We are not sure what we are going to do about it. I stopped the cabinet installers from installing one of the base boards.  They decided to add an extra cut that was not in the plans that would have put the base board over the carpet.  Which would have made it impossible to ever change the carpet.  John will work it out with the contractor tomorrow. 

I on the other hand got a lot of weaving done. With any luck I should have the rug off the loom tomorrow.  With the finishing work on Friday.  Then when I get the washer and dryer back, I can wash them and hang them out to dry.  I lose the washer and dryer for 2 days for the tile work. Then I can get a few scarfs done before he fundraiser. 






Monday, October 5, 2015

Moving Forward - Rebuilding

Today the cabinets arrived.  There were a few hiccups which will be fixed.