More cabinets were installed today. So we have all the cabinets, but not all the doors. One wall of cabinets came in 6 inches too short. A couple of holes were cut in the wrong place. We are not sure what we are going to do about it. I stopped the cabinet installers from installing one of the base boards. They decided to add an extra cut that was not in the plans that would have put the base board over the carpet. Which would have made it impossible to ever change the carpet. John will work it out with the contractor tomorrow.
I on the other hand got a lot of weaving done. With any luck I should have the rug off the loom tomorrow. With the finishing work on Friday. Then when I get the washer and dryer back, I can wash them and hang them out to dry. I lose the washer and dryer for 2 days for the tile work. Then I can get a few scarfs done before he fundraiser.