Friday, October 16, 2015

Remodeling Irony

Today I woke up with a really bad tension headache at 5am.  I keep running through my thought process what could cause such a bad headache so early in the morning. Then it dawned on me Irony. This might take some explanation.  On the bathroom sink it was just a matter of turning around and asking me if they had the right faucet before they started drilling the granite.

The long kitchen counter is a bit more complex.  There was one worker whom was making a lot of mistakes. The other guys would cover up for him and try to fix the mistakes before they were discovered.  They would give him simple tasks whenever possible.  They would count out one, two, three, four put the peg here and let him go to work. Then they would go back and fix the mistakes, no big deal.  But it became a big deal when the long counter was laid down.  '

To cover for the other worker who placed the support wood too low by 1/2 of an inch, it was decided among the other workers to tell the cabinet guy he screwed up, because it was his first lead job.  So 1/2 of an inch was trimmed off the cabinet and the counter was put in place.  I totally understand why the other workers covered for one of their own. Here is is, the next however. However if they would have just said let's check this measurement. And then moved the support wood up by 1/2 of an inch, the cabinet would not have been cut, and the dishwasher would have slid into place without a problem, and we would be one step closer to being finished. 

Now I will hurry to get dressed, because I do not know what time the contractor will be here to fix the boo boos. Then I will go ply some yarn so that I can test out my new fiber sink.  I think I will spend the rest of the day designing jewelry for next week.  

Thursday, October 15, 2015

Today's Boo Boo's

The first picture is what I walked into this morning.
At least I was not home for the discovery of today's remodeling boo boo. It turns out that the kitchen counter to fo low to slide the dish washer in place.  I think I am getting really tired of a boo boo a day.  So the current count is 2 counters that need to be fixed.  However I am really excited that I now have a deadacated sink to wash yarn and fiber in.  

The shellfs also arrived for the craft room.  I wonder how full I can pack them? This means that the next phase of remodeling will start before the first phase is finished. I think I will just go along with the craziness for now. 

Wednesday, October 14, 2015

Painting and More

Today I started off working on a contingency plan for the guest bathroom. I was looking for a possible base plate to cover up yesterday's boo-boo. The contractor walked in at that point and apologized for making the mistake yesterday. He also reassured me that he had enough "leftover granite to make a new piece for the bathroom. A new sink had been ordered since they could not remove the other sink since they used epoxy to attach the sink to the granite. 

Eric was home sick today, although he is on the road to recovery. He finished his pedialyte and started back on formula.  Eric defiantly did not like the painting. He jumped every time the compressor went off. So I spent a lot of time in his room today. I did not take pictures of the painting because I was so busy with Eric. Basically all the furniture was moved to the center of the room. Everything that was not being painted was covered in plastic. 

Once the painter left and Eric calmed down I got a much needed nap. I have been so stressed out that I find myself knitting in the middle of the night when I should be sleeping. I left Eric in charge of Elmo, Snoopy and Champagne Bear, while they watched TV. I felt so much better after a 2 hour nap. 


I have also been fascinated with the Ruffled Lace scarf’s, but could not find lace that I could work with until now. Red Heart makes a Boutique Sassy Lace in Nylon. So today I started my first ruffled lace scarf. It is slow going but fun. Pictures will follow. 

Tuesday, October 13, 2015

The Good and The Screw Up

Most of the day went well. The granite was installed.  It looks a lot less pink then our sample, so we will have to revisit the back splash.  Most of the cabinet work was finished.  The tile work on the floor as finished.  I spent the day bouncing between a sick Eric, keeping up with the work in the kitchen.  I also emptied the pantry. John and I emptied part of the craft room.  A dozen pair of earrings were made.  Amber came over to help me empty the pantry and part of the bookshelf.  

The one major screw up of the day came when no one asked me where the bathroom sink faucet was. The workman and contractor decided to use the 2 hole  utility sink faucet to drill the holes in the beautiful granite and not the single hole faucet that John and I had spent hours choosing.  

Tomorrow the painting starts at the back of the house.  Eric will be home another day.  I will also need to prep for Thursday.  

Monday, October 12, 2015

More Progress

More progress was made on the kitchen today. The crown molding was installed.  One cabinet was adjusted for Eric's percussion machine and nebulizer.  After more than a decade of use it will finally have a home of its own, not in the middle of the floor.  More electrical work was done too.  We now have power to where we are moving the tv. Hopefully the electrical will be finished tomorrow. Along with more finishing work. 

On the crafting front I did the finishing work on 2 rag rugs and made almost 2 dozen pair of earrings for the fundraiser on October 21st. I have another 18 layed out and ready for assembly.  I am not working on the earrings right now because I am sitting with a sick Eric.  So I guess that I will do some more knitting.  After all you can never do too much knitting. 

With Eric being sick and the granite being installed tomorrow it should be very interesting around here. My wish for all of you is to have a less interesting day. 

Sunday, October 11, 2015

1975 and More

Today was spent doing laundry, I only had 7 loads today. All but the last 3 are finished and put away.   One of the loads was the last 2 rag rugs for the sale on the 21st of October at the Tucson JCC to benefit the Taglit program. All I have to do is trim the little bits and pieces.  I also finished one scarf and started another scarf.  

The big news of the day is that I started working on the next phase of the remodel, yes I know the kitchen is not finished yet.  I am so excited that my craft room is our very next project, that I started working on that project today.   While I was sewing the edging of the rag rugs it occurred to me that I had a whole lot of cake decorating patterns that were so politically incorrect that they had to go. Don't get me wrong, they were ok to make in the mid 1970's, but this is not the 1970's anymore.   So I gained a whole 5 inches of shelf space back.  Yes, they were recycled. It may not sound like much, but it is a start.  

Rumor has it that the rest of the cabinets and the granite are arriving tomorrow.  


Saturday, October 10, 2015

Changes

The remodeling has brought about a lot of changes real and imaniged. Real changes included Eric's nebulalizer over heating to the point it could not be used any more. The dead nebulizer is pictured below. So I pulled the spare nebulizer out today. Yes, we keep a spare nebulizer, doesn't everyone?   I have also been throwing away old preschool and elementary school arts and crafts projects. Yes all the old and dusty relics have made it to the bin.  I  would like to point out that I really can throw things out. I will spend more time going through the rest of the shellfs tomorrow so construction in that area can begin on Monday. 

I also spent the afternoon clearing multiple craft project off the large couch.  I will try to keep project on the couch to a minimum.  Shelfs had been ordered to help organize the craft room.  We now have room to put in shellfs since the treadmill has been moved out.  Yes, I have lost a hiding place.  

The imaniged changes include a stack of yarn boxes in the garage from my last yarn stash reorganization a few years ago. Since clutter is disappearing at a good rate, they are now visible.  Please do me a favor, if you are a fellow knitter and have gotten yarn out of one of those boxes or you remember me putting them there, please let John know that they did not move in to the garage this month.  Another imaniged  change was on my part. I thought that we could not move forward with the remodel until the tv was relocated to the other side of the room. This is actually going to result in the tv being moved.  John has ordered parts.  After that happens we will need volunteers to help John move the furniture around. 

So ther you have it, the real and imaniged changes for the week.