A blog about my life, my fiber arts and pictures of my finished work. I will also throw in the very occasional recipe or shopping tip.
Thursday, October 15, 2015
Today's Boo Boo's
The first picture is what I walked into this morning. At least I was not home for the discovery of today's remodeling boo boo. It turns out that the kitchen counter to fo low to slide the dish washer in place. I think I am getting really tired of a boo boo a day. So the current count is 2 counters that need to be fixed. However I am really excited that I now have a deadacated sink to wash yarn and fiber in.
Labels:
craft room remodel,
kitchen remodel,
mistakes,
yarn sink
Wednesday, October 14, 2015
Painting and More
Today I started off working on a contingency plan for the guest
bathroom. I was looking for a possible base plate to cover up yesterday's
boo-boo. The contractor walked in at that point and apologized for making the
mistake yesterday. He also reassured me that he had enough "leftover
granite to make a new piece for the bathroom. A new sink had been ordered since
they could not remove the other sink since they used epoxy to attach the sink
to the granite.
Eric was home sick today, although he is
on the road to recovery. He finished his pedialyte and started back on formula. Eric defiantly did not like the painting. He jumped
every time the compressor went off. So I spent a lot of time in his room today.
I did not take pictures of the painting because I was so busy with Eric. Basically
all the furniture was moved to the center of the room. Everything that was not
being painted was covered in plastic.
Once the painter left and Eric calmed down
I got a much needed nap. I have been so stressed out that I find myself
knitting in the middle of the night when I should be sleeping. I left Eric in
charge of Elmo, Snoopy and Champagne Bear, while they watched TV. I felt so
much better after a 2 hour nap.
I have also been fascinated with the
Ruffled Lace scarf’s, but could not find lace that I could work with until now.
Red Heart makes a Boutique Sassy Lace in Nylon. So today I started my first
ruffled lace scarf. It is slow going but fun. Pictures will follow.
Tuesday, October 13, 2015
The Good and The Screw Up
Most of the day went well. The granite was installed. It looks a lot less pink then our sample, so we will have to revisit the back splash. Most of the cabinet work was finished. The tile work on the floor as finished. I spent the day bouncing between a sick Eric, keeping up with the work in the kitchen. I also emptied the pantry. John and I emptied part of the craft room. A dozen pair of earrings were made. Amber came over to help me empty the pantry and part of the bookshelf.
Tomorrow the painting starts at the back of the house. Eric will be home another day. I will also need to prep for Thursday.
Monday, October 12, 2015
More Progress
More progress was made on the kitchen today. The crown molding was installed. One cabinet was adjusted for Eric's percussion machine and nebulizer. After more than a decade of use it will finally have a home of its own, not in the middle of the floor. More electrical work was done too. We now have power to where we are moving the tv. Hopefully the electrical will be finished tomorrow. Along with more finishing work.
On the crafting front I did the finishing work on 2 rag rugs and made almost 2 dozen pair of earrings for the fundraiser on October 21st. I have another 18 layed out and ready for assembly. I am not working on the earrings right now because I am sitting with a sick Eric. So I guess that I will do some more knitting. After all you can never do too much knitting.
With Eric being sick and the granite being installed tomorrow it should be very interesting around here. My wish for all of you is to have a less interesting day.
Labels:
cabinets,
crown molding,
earrings,
electrical,
granite.,
kitchen remodel,
Rag Rugs,
sick kid.knitting
Sunday, October 11, 2015
1975 and More
Today was spent doing laundry, I only had 7 loads today. All but the last 3 are finished and put away. One of the loads was the last 2 rag rugs for the sale on the 21st of October at the Tucson JCC to benefit the Taglit program. All I have to do is trim the little bits and pieces. I also finished one scarf and started another scarf.
The big news of the day is that I started working on the next phase of the remodel, yes I know the kitchen is not finished yet. I am so excited that my craft room is our very next project, that I started working on that project today. While I was sewing the edging of the rag rugs it occurred to me that I had a whole lot of cake decorating patterns that were so politically incorrect that they had to go. Don't get me wrong, they were ok to make in the mid 1970's, but this is not the 1970's anymore. So I gained a whole 5 inches of shelf space back. Yes, they were recycled. It may not sound like much, but it is a start.
Rumor has it that the rest of the cabinets and the granite are arriving tomorrow.
Labels:
craft room,
Fundraiser,
kitchen,
laundry,
Rag Rugs,
remodel,
Taglit,
Tucson JCC
Saturday, October 10, 2015
Changes
The remodeling has brought about a lot of changes real and imaniged. Real changes included Eric's nebulalizer over heating to the point it could not be used any more. The dead nebulizer is pictured below. So I pulled the spare nebulizer out today. Yes, we keep a spare nebulizer, doesn't everyone? I have also been throwing away old preschool and elementary school arts and crafts projects. Yes all the old and dusty relics have made it to the bin. I would like to point out that I really can throw things out. I will spend more time going through the rest of the shellfs tomorrow so construction in that area can begin on Monday.
I also spent the afternoon clearing multiple craft project off the large couch. I will try to keep project on the couch to a minimum. Shelfs had been ordered to help organize the craft room. We now have room to put in shellfs since the treadmill has been moved out. Yes, I have lost a hiding place.
The imaniged changes include a stack of yarn boxes in the garage from my last yarn stash reorganization a few years ago. Since clutter is disappearing at a good rate, they are now visible. Please do me a favor, if you are a fellow knitter and have gotten yarn out of one of those boxes or you remember me putting them there, please let John know that they did not move in to the garage this month. Another imaniged change was on my part. I thought that we could not move forward with the remodel until the tv was relocated to the other side of the room. This is actually going to result in the tv being moved. John has ordered parts. After that happens we will need volunteers to help John move the furniture around.
So ther you have it, the real and imaniged changes for the week.
Labels:
Changes,
cleaning,
de cluttering,
Home remodel,
nebulizer,
organizing,
yarn stash
Friday, October 9, 2015
Tile Work
The tile work continued today. Almost all the tile is set. The grout was also finished on all the tile that is in place. The tile work will be finished on Tuesday when the rest of the tile arrives. We were also able to save the cut pieces that we did not use from the land fill, it will be going to a friend so she can spruce up her kitchen back splash.
I also finished knitting one scarf and the weaving done on a rag rug today. My poor loom took the worst of it when I cut the rug off. By accident I cut the tech solve which holds the cloth warping bar in place. So until I get more tech solve I will have to wait to start my next weaving project. So I started another scarf on size 11 knitting needles so it should be done fairly quickly.
I also get to start using the washer and dryer tomorrow. The tile and grout should be dry enough. This is a good thing because the laundry is at least knee high, with at least 8 loads of laundry lined up right now.
Subscribe to:
Posts (Atom)