Showing posts with label charity Hats. Show all posts
Showing posts with label charity Hats. Show all posts

Friday, August 23, 2024

One Week Out

 I am 1 week out from surgery last Friday and am being to feel better.  I am taking less Tylenol. I am sleeping better.  My daily numbers are down.  Apparently pain and the stress that the pain causes make all numbers go up.  I feel like my old self joking around with my husband.  I am getting faster with my zingers. 

So as much as the first week after surgery was difficult for me, in the end run it was very good to get the repair work done.  Yes, I do for the most part consider surgery repair work.  I still have 1 week of resting to do.  And my 1st post op next week.  I am hoping that things are healing to plan.  

Today I managed to finish plying the last third of my Tour de Fleece yarn.  I even managed to work out chain plying on my Hanson e-spinner, I just wish my arms were longer.  I am almost finished with the brim on the hat that I started yesterday. This one will be a planed scrappy hat.  

At this time blogger is having trouble uploading pictures. I will post the hat to instagram.


Wednesday, January 1, 2020

It’s the Last Hat

This is the last hat that I knit in 2019. It was hat number 80.  I hope you did not think that this was my last hat ever. I have many more hats to knit. There is never a shortage of cold heads in Tucson that need hats.  

Tuesday, August 13, 2019

Project 149

Hat number 56 of 2019.  I almost feel like I am slacking. Some days it is too hectic to get anything done this year.

Saturday, June 22, 2019

Projects 129 to 134

This weeks projects include 6 hats for the Flowing Wells School District Clothing Bank. Two are super wash wool and four are a soft cotton.

Sunday, June 2, 2019

Projects 109 to 118

The next nine projects include 6 charity hats and 3 skeins of yarn that I am keeping.