Showing posts with label hat. Show all posts
Showing posts with label hat. Show all posts

Wednesday, October 11, 2023

I Finished Two Projects

I fell short of my finishing my UFO goals today.  All I finished was 1 scarf and 1 hat.  I did however, tink 1 scarf and cast it on again.  I won’t put anything on someone else’s child that I would not put on my own child or wear myself. 

                    There is always tomorrow to get more done.




Sunday, August 6, 2023

Working on my PHD

 I am currently working on my PHD in knitting. For those of you who are not knitters, it means projects half done.  I am not going exceptionally fast.  In fact it took me until the end of July to finish my first hat of the year.  I know. Right. I should have been at least my 27th hat of the year.  

I have very little hand time each day which is divided into household tasks and my PHD’s.  That is further divided into knitting, crocheting a blanket for me, weaving, spinning, sewing and any other projects.  It also includes my energy level for the day., which is nonexistent on some days.  So it is slow going.   I also have a lot of PHD’s in the house. 

So without further ado, here is my first PHD of the year.  A hat, the same one as in the 1st paragraph. In cotton for an older kid. 



Saturday, December 25, 2021

100

 Tonight I reached my goal of 100 hand knit or hand woven projects for 2021 with days to spare. I have not taken a picture of project 100 because it is black and white, which needs good natural light to photograph.  So here is a picture of numbers 98 a long scarf and 99 a child’s hat.  I will rotate the hat on the desktop  



Tuesday, December 14, 2021

Projects 94 & 95

 These are both charity projects.  Project 94 is a hat.  I tried a new pattern that I saw on Instagram.  It is so cool that it is reversible.  This is meant for an older child or teenager. 

The next project is 95.  A 60 inch scarf for an older child or teenager.  It is meant to be folded in half or can go over the head and wrapped around the neck. It was knit with 2 strands of yarn on size 17 knitting needles.  

Monday, March 22, 2021

So Much Yarn, So Little Time

 I spent most of the day knitting while trying to get my body back in sync.  I am currently working on 2 different blankets, a scarf and a hat.  I have promised myself that I will finish one blanket before I start the next blanket. No matter how good the pattern looks in my head.  

Also I think I seriously misjudged how much yarn I really needed to get me through a pandemic.  I think that is understandable because prior to COVID19, I have not been in a pandemic.  For future reference that would be enough yarn for 25 to 30  small to medium sized projects every quarter.  Also I have found out that lots of people and stores are still selling yarn.  My hands are not as young as they once were.  I am slowing down.  

Tuesday, March 31, 2020

Today’s Hat

May I present hat 13 - 2020.  I am almost out of this grouping of purple yarn.  More colors to come.  Also don’t worry about the knitting needles or stitch markers, hat 14 - 2020 has been cast on and is 2 1/2 inches in.  I go to 7 inches before my decrease begins.

Saturday, March 14, 2020

Stash Busting Part 2

Another day another project completed. Today at lunch I started hat 11 - 2020 and finished it before bedtime. As long as I am home and curtailing my outside activities, to be read both The Tucson Festival of Books and the 4th Avenue Street fair have been cancelled do to concerns about the current pandemic.

I figure this is a really good time to knit, sew, weave and spin.  I know I will not completely empty my backlog of projects. I hope to make a sizable dent.  I also know that for somethings they will land in xxl storage bags for a few months until they are delivered. That’s ok, because they will be ready to leave the house.

It’s time to call it a night so I can be productive tomorrow.

Friday, March 13, 2020

Stash Busting

My goal this year is stash busting. Today was an exceptional day. I got two stash busting projects finished. So here are the details. Hat number 10 - 2020 was finished first. Followed by another shawl using leftover yarn from The NH Shawl pattern. I had 1 1/2 skeins leftover, so I made a 1 of 3 A Shawl Study using Neve yarn by Juniper Moon Farms.  On the shawl you might wonder why I pictured the shawl with a tiny bit of leftover yarn. This means that I won the yarn chicken game tonight and did not have to tink* out a whole row and re knit it as my cast off row.

This means that my 18th and 19th projects for the year are finished.  Since this is the 11th week of the year I might just make my goal of 100 finished projects this year.  This works out to almost 2 projects a week.

*tink is knitting spelled backwards.  To un knit a row of knitting.

Friday, May 3, 2019

Project 100

Another charity hat.  Project 100.  Off to do more knitting.

Sunday, March 17, 2019

Busy

Despite Eric wakings me up every 2 hours last night, I got a lot done around the house.  I did not finish the laundry and only did 2 loads.  Other chores were done instead

On the fiber side of my life Eric did help me start and finish 4 new bibs. I really don’t think he quite understood how many steps there are to making his bibs.  I only have 8 more to make and we can then retire some of the worn out bibs.  I cast on a new hat and got the first 1/2 inch of ribbing done. Only another 6 1/2 inches to go before the crown work.  I added another inch to the hand spun sherbet shawl on Raverly.   It was pointed out to me that I might just need to rewrite the pattern for a zourball. As not everyone can look at a basic pattern and just decide to use different yarn and needles and know it will come out.  Last but not least I got my Louet S15 out and started spinning some rolags from The Wooly Witch on Etsy. I am getting an nice fine spin.  Once plyed it should be a sport weight yarn. It has been on my to do list since the spring of 2017.   I am still on the first rolag.  See the yardage so far.



 

Tuesday, June 7, 2016

On A Roll

Today I finished 1 crochet project, a child's purse that has been on the hook for over 4 years and 1 hat before noon today.  John will be very happy that the purse was no sooner off the hook then it found its way to a new home that was not ours. Since I did not want the circular knitting needles to be lonely, I cast on the next hat. In reality I find it harder to lose stitch markers and knitting needles when they are in the middle of a project. Even though it is too heavy to carry around, I was reminded that it was past time to finish Teri's 1st year of law school blanket. Miss Teri, how many years is it overdue?

I certainly don't have the energy for it but now that it is under 100f, it is time to wash Eric's swim stuff from today. while I am at it a little picking up would not hurt either. After all no matter how much I want to play all day with fiber, the house work should come first. Maybe I will have dinner with John first.

Saturday, June 4, 2016

A New Pattern

Today I added a new pattern to my Ravelry Shop. I have found that when I use 3 different cameras to take pictures, the pictures go to 3 different places in the computer memory. John says he has an easy fix for this. It took me 3 days to transfer the pattern from my iPad to the main computer and add the picture, I could have knit this pattern at least 3 times in the time it took to transfer the pattern. I know that this is a winter hat, made with bulky yarn. When the high is 111 for the day, I find that releasing a winter hat pattern adds a bit of fun to the day. It's a Tucson thing, where else do you go to celebrate the first day of 100 degree weather of the season?

The hat is called Grandma's Winter Hat and my friend Jimmy was gracious enough to be my model. This is the link to Grandma's Winter Hat . Even though it is listed on Ravelry you will be able to view and purchase this pattern with this link. It will fit teenages through adults. If you are in a country outside the United States, use this link to  Loveknitting.com , you can find this pattern and 5 of my other patterns. At Love Knitting you will also be able to buy the yarn and supplies to knit this pattern.


Tuesday, January 27, 2015

Project Number 4

My next finished item of the year is 1 hat for 75 rows.  I forgot to take a picture of the wash cloth I finished Sunday.  So I will get the row count when I finish the next wash cloth.  

Friday, October 18, 2013

Hats

Today was all about hats. I finished 4 of the hats that I mentioned in yesterday's blog.  I only have 26 to go to make the knitting guild presidents challenge of 30 in 30 days.  Since each hat is taking about 1 skein of yarn do to using 2 strands of yarn to knit with at a time.  I should have 30 less skeins of yarn in the house when this challenge is finished.  This might sound like a lot of yarn, which it is by any standard, but I doubt this will make much of a dent in my yarn stash. 

So here is a picture of the first hat I finished this morning. All 32 rows.  Mixing a white yarn with a variegated yarn has a nice look to it.