Monday, January 18, 2016

Rethinking Laundry

With the new larger wash tub, I think I will have to rethink the way I do laundry. This is for the better. Today I did the weekly towels, in the old washer it would have been 2 full loads. Today the towels filled a little less than 1/2 the tub.  With the whites I saved 2 days of laundry ( this should read 2 loads in the old washer ) and used a little less than 2/3's of the tub. So I am going to try waiting for 3 days before I do the whites again. That is unless we have a laundry explosion.  So I am thinking I will cut my current  of 25 loads of laundry week down to 10 to 12 loads a week.  Yes I will have the same amount of folding. I am thinking that unless the laundry is eyrpy that I will no longer be doing laundry in the middle of the night. 

I am so grateful for the simply wonderful engineering from the LG Washer Group.  Thank you so much.. I would also like to thank my wonderful husband for getting me such a wonderful washer.  By the way Sears called back today and will check to make sure we are in perfect level.  They said it should have been done on Saturday as part of the delivery.  

On a different note when I am not wearing my usual 2 inch heals, I need Teri's step stool to reach in to the bottom of the tub. Teri don't expect to get your step stool back anytime soon. 

I will have to figure out how all this will effect how much extra time I have for other things.  I can see more knitting, weaving, spinning and sewing in my future.  Maybe even a few more new patterns published.  

Up date 11:40 pm, Eric must have heard that I was doing less laundry. Since I first posted this earlier tonight he has made a load of eyrpy laundry...and life goes on.  


Saturday, January 16, 2016

Eric's New Washer

Our new washing machine arrived today. We got the LG model WT7700H*A. John did all the research and found the largest, most energy efficient top loader that LG makes.  I would like to say that the washer held what use to be 2 loads in the old washer and did not even top out the new washer.  The washer runs about 30 decibels quieter too, around 50 decibel's instead of 80 decibel's. Did I mention it uses less water too.  

The second load I ran today would have been 1 full load and then some in the old washer.  In the new washer it did not even make a dent in capacity. The new washer weighed the clothes and added just the right amount of water. Kudos go to the engineering team at the LG Washer Group.

The only downside of the whole day was the delivery made by Sears, where we bought the machine.  John had asked the driver  twice, if the machine needed to be leveled. The driver told John that is was self leveling,twice. The delivery man than ran the first wash. We noticed that the machine was noisier and shaking more than the reviews said it would. So John check the position of the tub. The tub was not level.  So John used his level to verify the results.  We called the delivery number and asked that they be sent back to level the new washer. Multiple call were ignored. 

Meanwhile I did some research on the web and found that we could do serious harm to the washer if we used it unbalanced. This upset me to no end that Sears could not install a washing machine properly.  I think that they sell a lot of them too.This made me long for the days of Circuit City, where we bought our last washer when the kids were little.  They got the install done right at the time of delivery. 

By the time I lost it, John figured out how to get the machine level. So how I would some up the day, good job marks go to LG for making a great machine and to John for getting the machine as level as he could. On the other hand Sears needs to make a cheat sheet for its delivery drivers that tells them what each install requires.  They also need to be more responsive to its customers.  Just in case you are wondering Sears did not respond to various tweets on Twitter either.  I guess it is take the money and run. 

The old and new washing machines side by side.  The geek picture of the day is of the 1st load of clothes running.  I could not get the whole tub in the picture.




Friday, January 15, 2016

A New Project

Last night I started a new project. I am actually knitting something for me.  I am using Dream in Color. The blend is wool, cashmere and nylon.  It is a lace weight yarn that I am knitting on US sized 11 needles.  In a a nice verigated blue.  I am hoping that 2 skeins will be enough.  

Wednesday, January 13, 2016

Busy, Busy, Sore

There have been a lot of late nights with Eric.  Post viral asthma has struck with a vengence.  That has lead to a lot of naps and not much getting done around here.  This has also lead to a flare up for me, right now my elbows and ankles are not on friendly terms with me.   I know things will get better when Eric feels better.  

Sunday, January 10, 2016

Amish Shadows

The quilt is fiannly back on the wall after the remodel. I made this quilt in December of 1987. Even after a professional cleaning, I have been told by a reliable source that the quilt has lost that new quilt look. Not bad for an almost 30 year old quilt. Yes that is a Tucson made Bens Bell hanging from the side.  

Saturday, January 9, 2016

Yeah for Sleep

I managed to get 7 hours of sleep last night. Needless to say I had a better day. Today. I even got to the mall today with Lisa. Aside from laundry, shopping and knitting not much got done.  

Friday, January 8, 2016

Time Warp

There comes a time in every moms lives called the time warp.  I have entered the time warp. It comes when Eric gets into a cycle of getting sick, recovering some then going back to his program.  Then I just begin to reset my routine, but have not fully recovered from the long nights and broken sleep. Then Eric gets sick again.  After 2 or 3 cycles of this the time warp kicks in. 

I am in the time warp right now.  So that I have trouble sleeping more then 3 hours at a time. So I land up talking a lot of naps.  My meal schedule is so off too, sometimes breakfast at 6 or 7 lunch at 3 pm and then I am not ready for dinner at 6pm so I have an appetizer for dinner. Then I tend to snack too much late at night. 

I am hoping that this cold is the last one Eric will have for a while. I spent the day cleaning and doing laundry.  I am still exhausted but am too hyper to sleep. So I tried spinning lace weight yarn before dinner.  After dinner I finished knitting 2 hats and cast on one more so far.   I am hoping that Eric will sleep tonight and that I can unwind to sleep. I really want to break this cycle.  I am tired of being out of sync.