A blog about my life, my fiber arts and pictures of my finished work. I will also throw in the very occasional recipe or shopping tip.
Friday, October 2, 2015
Kitchen Remodel - Dry Wall and More
It had to happen sometime durning the remodel. Eric had one of his bad nights. There were 4 loads of eyrpy laundry done between 9 pm and 7am. I made a quick run for tea before the drywall person came. Around 10 we were able to start Eric on pedilyte. I was too tired to do much knitting.
Labels:
backsplash tile,
dry wall,
kitchen remodel,
laundry,
sick kid
Thursday, October 1, 2015
A Partial Day Off
Today John only worked a half a day and the contractors were not do until this afternoon. I took the morning to do a little shopping after I dropped Eric off at his program. Then I spent the afternoon at Grandma's Spinning Wheel.. I got a good 3 ounces spun and managed to relax.
I also received a donation of yarn today. Since I knew the knitting guild yarn stash was full, I dropped it off to a group who knit blankets for kids who are trying to stay in school despite being abandoned by their families. They should have enough to knit 3 more blankets. Did I mention that commercial yarn cones are heavy?
I am ending the day washing eyrpy laundry..yes, Eric is eyrpy with a sore tummy. I think I will try to sneak off for a little sleep after I start the 3rd load of laundry for the night. As it stands at the moment load 1 is in the dryer, load 2 is in the washer and load 3 is pending.
I think it is time to start knitting scarfs.
Tuesday, September 29, 2015
Kitchen Remodel Plus Life
Today was the last day of demolition and reconstruction has started. I would like to point out the reason we did not get a gas range is because we do not have a gas outlet in the kitchen. Lisa, that picture is for you. To make things a little more hectic around the house today, Eric got sent home from program. You will also notice a 2,000 jump in my rows knit. That is because I used today to start counting the finished knitting that I have been dumping in a laundry basket behind the couch. I only got 1/2 way through the basket. Did I mention that I still have a few UFO's too?
Labels:
kitchen remodel,
knitting,
One Million Row Challenge,
Raverly,
sick kid
Monday, September 28, 2015
Electrical and More
Today work continued on the electrical work. The wall was partially opened and the plumbing was started. Three layers of lenolium were also removed. John and I traded off spending the day with Eric in his room, because he had the day off.
Labels:
demolition,
electrical,
kitchen,
lenolium,
plumbing,
remodel
Thursday, September 24, 2015
Demolition Part 1
The first part of demolition happened today. The water side of the kitchen was taken out, i.e. the sink and dishwasher. The fridge was moved but with no water connection I think I will put a few bottles of water in the fridge. If it shows up the tan was the original paint color of the house.
Labels:
demolition. Sink,
dishwasher.,
kitchen remodel
Wednesday, September 23, 2015
Goodbye Old Kitchen
These are the last pictures of the old kitchen. Construction starts tomorrow at 9 am for the 1st phase of demolition. Yes, Rich we will save the sink and lazy Susan for you, sorry Kari, it must be a guy thing. I only have the pots, cooking untensils and silverware left to pack. I am sure that John will move K-5 for me.
Monday, September 21, 2015
Be Careful How You Ask For Things
Yesterday Eric had me up at 4 am, because he kicked his covers off and was cold. So I asked Eric last night before he went to sleep not to wake me up at 4 am again. He followed my instructions to a
T. He did not wake me up at 4 am, but instead at 3 am with the wild eyrps. Yes, I know it was not 4 am and that being eyrpy is just a fact of life. I still wonder if I had said don't wake me up before 6 am if the results would have been different?
On the bright side, I am caught up with all the eyrpy laundry at the moment. I also got to sneak out of the house for 30 minutes to pick up a Brugers Bagle breakfast sandwich and a cuppa tea. I also picked up a hot Starbucks treat too, so that I am in the tea this morning. It still won't be enough to keep me awake, but it's a start. Did I mention that it started raining at 7 am? And because Eric is sick today, that I will not have to get Eric and his chair from the car to his day program while trying to keep us and the chair dry.
So today I will knit and do finishing work. Then I will count rows in the finished basket for the one million row challenge on Raverly. Then try to get as much as possible in plastic bags and containers because the demolition on the kitchen starts Thursday morning. So anything I don't want to be dusty will have to be in the craft room or in plastic containers. Yes, I will take you along for the journey, sometimes with just pictures.
Labels:
Burgers Bagels,
finishing work,
instructions,
kitchen,
knitting,
packing,
remodel,
sick kid,
Starbucks,
tea
Subscribe to:
Posts (Atom)