Showing posts with label coasters. Show all posts
Showing posts with label coasters. Show all posts

Friday, December 16, 2022

Done with Coasters for 2022

 I wove the last coaster for the year.  So after dinner I cleaned off my work table.  Packaged all the random yarn into bags by color. Then reorganized the weaving cart.  I have 1 3/4 trays filled with bags of yarn.  One loom and all the smaller weaving tools on 1/4 of the second tray. The top tray had the larger small loom and the warp.  I was told if I put everything thing away in an organized fashion, I would be more productive in the long run   

You might remember that before I started this small weaving binge for the mudd rugs aka coasters I had all 3 trays overflowing with small skeins of hand spun yarn.  This is a good thing.  Coasters are leaving the house as gifts. Well almost all of the coasters.  I did fall in love with 2 that I will be keeping.  

I also tinked a summer top that I had started.  With the rate I was knitting compared to how fast the inches and weight are leaving.  It would have been too large to wear before I even finished the back.  So after tinking the sweater, I cleaned out the bag.  I replaced the yarn with a skein of yarn to make a shawl.  I choose a pattern that will look good no mater how much weight I lose.  Even losing a few more sizes it will still look good.  

So this is how I left my small weaving cart. The small carrier bag is for yarn scraps that will go into future dog pillows.  No I have not organized the entire room yet.  I project at a time.  


Friday, November 18, 2022

Finishing Work

 I don’t know about you but weaving in the ends and doing finishing work often takes a backseat to creating.  Tonight I had an ever growing pile of the evil finishing work.  I decided it was time only because I am currently creating more art the will require finishing work.  It is an evil, vicious cycle.  Create many, many things. Wait until I have a small pile and just sit down and do it.  Repeat.  

You know what comes next, don’t you. Taking pictures and posting to Ravelry. Well that will be tomorrow in better light.  In the meantime please enjoy the group photo.  Three hats for the Flowing Wells SD Clothing Bank, 2 cotton and 1 super wash wool hat made of hand spun yarn.  I hope the kids like the colors. Also 6 coasters woven from hand spun yarn. I wove 7, but one had a major problem not worth fixing so it is going to the dogs for pillow stuffing. Waste not want not.  

Then everything will go in the proper storage bags. 


Wednesday, November 2, 2022

Today’s Playtime

 I have a really good use for my hand spun yarn that is not up to my knitting standards for yarn.  For some reason it looks great in a weaving projects.  I have been bingeing on coasters. Pulling out bits and pieces for an abstract weaving.  I have been having a great time playing.  This is a bit of todays play time.  


Sunday, October 16, 2022

A Side Effect of Looking for Craft Supplies

 I found another UFO today. This one was a coaster project. One of the two coasters was halfway done. I finished the one that was halfway done and started the second coaster aka mud rug. I am using hand spun yarn made on one of my drop spindles. Finding the UFO was unintentional, what I was really looking for was a Navajo weaving needle that was between eight and 10 inches long. Obviously I did not find the weaving needle. I don’t think I have one.

Since I will not be going to any more yarn festivals this year I hope to source one or 2 Navajo weaving needles on line. Wish me luck.  If you know a source, please let me know  

I have found that weaving during the day makes knitting easier at night. Did you know that weaving uses more yarn than knitting. To my family that must be a plus. Another plus is that if you would like a unique one of a kind gift for the holidays I will be selling the pair as I have all the coasters I need in the house. They are made from wool which will help absorb moisture. The pair will sell for $25.00 which includes postage in the United States. After I finish weaving the second one, I will wash them in hot soapy water to set the weaving. Then they will be trimmed. And ready to go. Email me if you would like them.  Then I will mark them pending until payment is received. 


Friday, July 8, 2016

Day 14

I would like to start out by quashing the rumors that Eric is in the hospital.  No, he has been home the entire 2 weeks with the exception of Tuesday's doctors appointment.  This has been very difficult cold for both John and Eric.  The medicine seems to be working with Eric, and his numbers are slowly getting better. 

I did not got a lot of spinning done today. I mostly finished plying yesterday's yarn. I washed and thwacked about a pound of hand spun yarn today.  I also got a set of coasters off the very mini loom today and had more leftover hand spun wool so I started another set. All I have to do is the finishing work tomorrow.  It's getting late so I will call it a night.