The new dryer finally arrived today. All I can say is thank goodness. Right now I have the 4th load of the day in the dryer and I hope to have a 5th load in there before bed time. With 6 loads done all together, the first one of the day was a line dry load. The answer to the question is no this will not in any way shape or form mean that I am caught up on laundry. The reason being is that I took a 4 day vacation from laundry. The guys were getting tired of lined dried clothes. Even with the use of Downy, the jeans were like wooden boards. The clothes off the line reminded me of my clothes during the 1960's when we put the clothes on the line to dry. Every thing was stiff.
On the knitting front, I made more progress on my socks and purple shawl. No spinning took place today. Although I have bribed someone with hand spun yarn so she needs to come over and pick the fluff she wants me to spin for her. I will have to spin it up very soon. By the way spinners, hand spun yarn makes a very good bribe for a knitter.
Eric is still home and I am really hoping to get him out the door sometime this week. I am so far behind on every thing. I will play more catch up tomorrow. As for the plans for today, they went out the window at about 2 am, when I finally got to bed this morning. Considering that I was running on 4 hours of sleep I feel that a lot of work got done today. I have yet to figure out why I can accomplish so much on so little sleep.
I think it is time to say good night because I am falling asleep while typing this post.