Today was a very busy day around here. I was not as efficient as I had hoped to be. That being said it was a day of multiples of 4 as in 4 loads of laundry completed. 4 bags of recycling left the house. Four large piles of paper work dispatched. Then to shake things up the 2 naps I took when I was too tired to move. Then 4 rows of knitting tonight, including going back 4 rows to pick up a dropped stitch. After the repair it was impossible to tell where I dropped the stitch.
With all that I accomplished today, I am still not done. Hopefully I will finish the rest of today’s work tomorrow. I really want to finish the 4 color fade shawl this coming week. With the longer rows I am going through the second skein faster than the first skein.
With tomorrow being an early and busy day, I need to get to sleep early tonight.
No comments:
Post a Comment