Wednesday, July 5, 2017

I Took Time Off Today

This last flare up just won't go away. So I took some extra rest time today. I spent the morning after dropping Eric off at his program with my feet up finishing hat number 4 for the month. I then cast on another cotton hat, so the knitting needles would not get lonely.

I did do a few chores but skipped the laundry because it was well over 100f by 10:30am. After lunch I started readimg a new book until I fell asleep. I woke up just intime to pick up Eric. I got my Tour de Fleece spinning in while we caught up on yesterdays concerts and fire works.

John was wonderful and brought home dinner. After dinner I finished hat number 5 for the month and cast on another wool hat. I am rather happy that i am knitting so many hats, but I swear the next person who was born in the snow belt that says "it's not cold enough for winter clothes in Arizona will be sent home at the first sign of snow..

Monday, July 3, 2017

Tour de Fleece 2017

My first spin of this years Tour de Fleece was 8 ounces of Superwash BFL dyed by Into The Whriled in 2012. I love the roving that they dye, so here is the link, www.intothewhirled.com. Yes i am stash busting for this years Tour de Fleece. I was trying to spin a fractial, I did not quite make it. Since it took almost an hour to skein and photograph, I am counting it towards the first 3 days os spinning.

Sunday, July 2, 2017

Tinking

I have decided that it is a little bit more than silly to need a charity hat and a size one knitting needle. So I will be tinking the hat can and then use is in the Yarn double stranded in another charity hat.

Saturday, July 1, 2017

Hats

In June I knit 17 hats for charity.

Wednesday, June 28, 2017

In The Blender

Eric had a rough night last night and I don't even remember what time that I got him settled down for the night.  All I know is that 6 am came much too quickly. Eric's bad night lasted for most of the day. So,Eric skipped his day program and helped me sort the double pointed knitting needles by size. I now can say that I know where most of my double pointed knitting needles are. I think that I can lose quite a few before I have to run out and buy replacements. Of course there is still the odd one floating around the house and a set with each hat knitting bag. I keep one bag for knitting animal fiber hats and one bag for plant based fiber hats. The are no bags for petroleum based fiber hats, as I feel that no one should be forced to wear clothing made from a non-renewable resource.

I think that I will be putting all my knitting accessories in one spot too. I have not decided what I will put all the accessories in yet. That and single pointed straight knitting needles will be done on Friday. I find it kinda of odd that after over 30 years of marriage that I am finally starting to understand my engineer's mind for organization and that sometimes less is more.

I usually do not run the washer and dryer after 100f, but I got a late start at  laundry today. Even though I was finished with the laundry by 10:30 am it was over 100f already. It did feel on the cooler side today at lunch time it felt a bit chilly at 105f with a light breeze after last weeks 115f and 116f days.

I also found time to start knitting a new wool hat tonight and am halfway through with it. I think that is is time to go do some reading.

Tuesday, June 27, 2017

Circular Knitting Needles

Today I started organizing my knitting needles starting with the circular needles. I had the knitting needles in 3 different areas. Hopefully having them in one spot will make things easier to find the right knitting needle when I need one for a project. They are also off my closet floor. The needles, are sorted from U.S. size 0 to size 50. They are also in a container that will not allow them to fall on the floor.  I really like the idea of my knitting needles not falling on the floor. Of course this does not include the knitting needles on projects. I must have a lot of projects on sizes, 6, 7, 8 and 11's.  Tomorrow I will work on the double point needles. I will save the straight knitting needles for Friday. As you can tell my deep cleaning has slowed down quite a bit, but I am down to the knitty gritty of the job so things are going much slower pace. 

I also managed to finish knitting 2 hats and casting another cotton hat on. I like to keep a cotton hat for knitting on the go and a wool hat to knit at home. I still need to cast on a wool hat. At a year post hand surgery I am still limited by my hands in how long I can knit each day, but at least I can knit again. 

Monday, June 26, 2017

107f

I have lost count of the days it has been over 105f in a row so far this summer. Yet I know that winter is coming and the knitting of children's hats and scarfs is on going, besides they don't sit in my lap as I knit.

I am really enjoying having a huge washing machine. I can wash most of Eric's clothes every other night as it has been too hot to run the machine during the day.