Sunday, November 10, 2013

Busy as a Mommy

It has been a very busy and productive weekend around here. Eric managed to fill the laundry room knee high with laundry 2 days in a row.  I did 9 loads of laundry over 2 days and very little belonged to anyone but Eric.  

Elsewhere around the house I managed to do the following:  Fill the huge roll out recycle bin to with in 2 inches of the top. Finish and get a taker for 4 dog pillows. Repair 1 bib for Eric.  Tried a new spinning ratio on the Louet spinning wheel, I did not think it was possible to get yarn of this weight, yeah. Make a major dent in cleaning the guest room for thanksgiving company.  In case you did not know it, the craft room and guest room are one in the same.  We just pull down the Murphy bed when we have company.  Finished 3 more charity hats.  Last but not least start my to do list for Monday.  If I start now or run all day tomorrow I might finish half of the list.  

I would like to thank all of our Veterans for making this crazy life of mine possible. You are some of the most caring and helpful people around.  

Thursday, November 7, 2013

Power Issues

I woke up this morning to find a solid yellow light on the computer.  As per my in house engineering fellow aka my husband, we have a power supply problem.  We have ordered the part and it will be installed upon delivery of the part. So until then all my blog post and anything computer related will happen from my Ipod.  Since I have not figured out how to share this on Facebook my simple request is that you share this on Facebook and tag me in the post so I can share with everyone else.  

I am also have a low energy day.  Too bad I can not be fixed with a new power supply.  Two naps later and I am begining to feel better. I don't expect to get more than dinner cooked and a little knitting done today.  

So basically nothing much is happening here today. Also I am including a picture of the sick computer.  The power supply is on the lower left I think.  It's the shiny part. 

Wednesday, November 6, 2013

On a Roll

Today was one of those truly exceptional days. I was not an object in motion but still managed to get a lot of things finished,  starting with scrubbing the stove top. I decided to opt out of scrubbing the inserts by hand and instead used the dishwasher. I did manage to get all 4 loads of laundry washed and all but 1 is complete. Don't worry I think Eric has made at least one load for tomorrow.

On the craft front I finished knitting 2 hats, sewing 3 pillows for Eric, found the vest and buttons that made it into the sewing room so long ago that I can not remember when it hit the repair basket. My hands were a little to stiff to sew the buttons on tonight.

John and I went out for some couple time and I think we were mistaken for snow birds. We also made it to the grocery store. John made a lovely salad for dinner and even cleaned up afterward.

I think that I am falling asleep and Eric sounds quiet so I think I will call it a very early night.

Tuesday, November 5, 2013

Exhaustion

Exhaustion has set in. I spent most of my day sleeping. My 2 major accomplishments of the day were voting and finishing 1 hat.

Monday, November 4, 2013

Being Productive

I seem to be in a finishing mood today. I started out the day by crocheting the edging on 2 wash cloths. They were going to be for a fundraiser that fell through. Once the fund raiser fell though I put them on the back burner. So they are now done so I need to figure out what I will do with them.  Any thoughts besides keeping them?

Because the next batch of hats is going to stay local, I gathered up some bits and pieces of cotton yarn and started another batch of 30 hats. I will also make some wool hats too. I think the pattern is so simple it is a little additive. One hat got completed from start to finish and the next hat is 2 inches in.

I did have John put one box of yarn into the garage. I hope to get enough knitting done to bring it in sometime around January. This requires that I actually do some knitting for myself and get caught up on pretty things that I want to wear.

I was on the tired side today so not much housework got done. I see the next big push out of the craft room is going to be pillows. I will make both positioning pillows for Eric's bed, his day program and some dog pillows. This should take out about 1/3 of the clutter.

Well it does seem to be about time to call it a day so please take the time to enjoy your families.

Sunday, November 3, 2013

I Cheated

The challenge for knitting guild was suppose to be to knit one hat a day for 30 days. The challenge started October 17th. I just finished hat number 30 an hour ago on November 3rd. So I did the challenge in just 18 days. This is not earth shattering cheating by any means. With as crazy as this house gets sometimes, I just wanted to make sure that all 30 hats were done on time.

These hats are going to a place in Pinal County called Children's Closet. Their goal is to provide clothing for children so that they have clothing and shoes to go to school. Before this program started children in some areas frequently missed school days because it was not their turn to get to wear the 1 set of clothes or shoes that the family had for school that day. Winter clothing was not part of the outfit either.  I know that this effort will barely put a dent in the problem, but at least 30 little
 heads will be a little warmer this winter.

So here is the picture of all 30 hats. Each hat was 32 rows on size 13 knitting needles. So you will notice that the counter will go up by 960 rows on The one million row challenge. Yes this is double dipping but I am sure it will be OK.

Saturday, November 2, 2013

All About Fiber Part 2

Here is the picture of all that I dyed for my first dyeing experience. It looks pretty good in my very humble opinion. let me know if you want to see pictures of the hand combed top.