Showing posts with label tile. Show all posts
Showing posts with label tile. Show all posts

Tuesday, October 20, 2015

The Stove and Back Splash

Today the back splash started going in.  I think it looks really nice.  John did a very good job picking it out.  The stove is being a bit stubborn, it is taking a little more work than we thought.  They will have to move the electrical outlet tomorrow. Today we took out a bit of tile under the stove.  So we could level the stove with the counter.  

While the work in the kitchen continued, I made 60 pairs of earrings for the fund raiser tomorrow. I found that having the Ott lite over my shoulder made it easier to do things while getting ready for tomorrow , I also found some earrings that I made a while a go. They should go nicely with the ones I made today.  

I would also like to leave e everyone with a favorite quote of mine. "I am standing on the shoulders of the of the ones who came before me."

Tuesday, October 13, 2015

The Good and The Screw Up

Most of the day went well. The granite was installed.  It looks a lot less pink then our sample, so we will have to revisit the back splash.  Most of the cabinet work was finished.  The tile work on the floor as finished.  I spent the day bouncing between a sick Eric, keeping up with the work in the kitchen.  I also emptied the pantry. John and I emptied part of the craft room.  A dozen pair of earrings were made.  Amber came over to help me empty the pantry and part of the bookshelf.  

The one major screw up of the day came when no one asked me where the bathroom sink faucet was. The workman and contractor decided to use the 2 hole  utility sink faucet to drill the holes in the beautiful granite and not the single hole faucet that John and I had spent hours choosing.  

Tomorrow the painting starts at the back of the house.  Eric will be home another day.  I will also need to prep for Thursday.  

Friday, October 9, 2015

Tile Work

The tile work continued today.  Almost all the tile is set. The grout was also finished on all the tile that is in place.  The tile work will be finished on Tuesday when the rest of the tile arrives.  We were also able to save the cut pieces that we did not use from the land fill, it will be going to a friend so she can spruce up her kitchen back splash. 

I also finished knitting one scarf and the weaving done on a rag rug today. My poor loom took the worst of it when I cut the rug off. By accident I cut the tech solve which holds the cloth warping bar in place.  So until I get more tech solve I will have to wait to start my next weaving project.  So I started another scarf on size 11 knitting needles so it should be done fairly quickly. 

I also get to start using the washer and dryer tomorrow.  The tile and grout  should be dry enough.  This is a good thing because the laundry is at least knee high, with at least 8 loads of laundry lined up right now.